So I'm putting a new carrier in my 14bff. I'm having trouble figuring out what exactly is meant in the set-up of the carrier preload. The 14 bolt bible and other sources say (not verbatim) to set the right side adjuster, you forcibly tighten the adjuster against the carrier, back off so it's not touching the bearing, and tighten again until contact, then turn 2 or so more slots.
Do they mean forcibly tighten again, then two slots more? Or just until it touches, then two slots more? It wasn't super tight, just snug+ when I did the latter. I've read on ringandpinion to tighten it pretty damn hard. The guy says he tightens as hard as he can with a 10-12" spanner and has never had bearings prematurely wear out. What say you? I want to get this right. I do remember that loosening the adjusters wasn't very hard to do, both on the donor and the new axle.
Do they mean forcibly tighten again, then two slots more? Or just until it touches, then two slots more? It wasn't super tight, just snug+ when I did the latter. I've read on ringandpinion to tighten it pretty damn hard. The guy says he tightens as hard as he can with a 10-12" spanner and has never had bearings prematurely wear out. What say you? I want to get this right. I do remember that loosening the adjusters wasn't very hard to do, both on the donor and the new axle.
