Iron_Weasel
Registered Member
I'm looking to buy the NP203 twin stick that ORD makes, but I have a few questions about it.
1) What's the lead time on it?
2) Does it bolt right up to the existing transfer case mounting location?
3) Are there any modifications that will need to be made to allow use of the twin stick design as opposed to the factory stick?
1) What's the lead time on it?
2) Does it bolt right up to the existing transfer case mounting location?
3) Are there any modifications that will need to be made to allow use of the twin stick design as opposed to the factory stick?

