CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

1979 dana 60 to a newer part time 60 with hubs

84CUCV

3/4 ton status
Joined
Jul 1, 2002
Posts
7,150
Reaction score
2
Location
NJ for now
I would like to get ride of the full time and make it a part time. Can it be done? Where would i find 60 parts? Id there anything different about my 79 60 and my 84? All the same right?? thanks mike
 
should be the same. all u need to do is pull the slugs (drive flanges) out of the full time one & install lock outs
 
WOW that is great!! I thought you needed a 85 and up 60 parts for it. So just need hubs. Thanks
 

Latest Posts

Top Bottom