justwhatido
1/2 ton status
gas tank (31 gal), new wheel bearings, seals, rotors, calipers and ss braid extended brake hoses.
Going to try to finish engine and install new engine, transmission and transfer case next week. Then, off to Line-X for floor spray, and back to the body shop to finish body.
On the road by end of June?
Fred
Going to try to finish engine and install new engine, transmission and transfer case next week. Then, off to Line-X for floor spray, and back to the body shop to finish body.
On the road by end of June?
Fred