The old CDR with busted rubber elbow fitting, goes to the two hoses on the intake, 1 either side.
This piece is no longer manufactured, so we need to fab one up. Steel would be the best choice, would last longer than rubber.
The main body has been cut, and drilled... ready for two short tubes to connect jumper hoses to.
The first smaller pipe getting ready to be fish mouthed with a hole saw.
The end result, coped out for a fit up to the main body.
Testing fit up.
Cutting short tube to length. Cut off wheel installed. Ghetto Fab Shop style.
Fit up for tacking, and welding.
First one welded, ready for second pipe.
The Ghetto Fab Shop setup, Eastwood welder is the bomb!
Just a shot of some Ghetto Fab tools! :-)
Pressed for time, I choose function over form by just welding on the bottom in a less than desirable visual finish, but functions perfectly. :-)
"Finished" product. Leak testing and painting to be done.
"Ghetto Hydro Testing" for leaks. One pinhole leak found, fixed no problems.
Getting dipped in the Ghetto Dip Tank.
Sweet! Thick ass coat of paint, should take about 300 days to cure! HA HA!
The elbow's new resting place for the next day or so, allow it to fully cure before installing. Dipping allows paint to get all in the inside for a nice protective coat.
As soon as it cures, Ill post pix on the install.