So this is what I have I just put together a np205 and finished off the doubler. The np205 has the front 32 spline output. What I need now is a to get my front drive shaft work. I figured I could get a 32spline mounting flange from high angle drivelines but I would need a flange type cv joint for the shaft then just get it lengthened.
Does anyone have any ideas on where i can get a CV joint probably?
Or should I just get a new drive shaft built all together?
Thanks for the imput

Does anyone have any ideas on where i can get a CV joint probably?

Or should I just get a new drive shaft built all together?

Thanks for the imput

