big pappa b
3/4 ton status
In my quest to have everything done for ECBB I found some time this weekend. Thought I was gonna have 2 full days to work but ended up at the emergency room saturday morning with the wife. She never gets sick but this flu virus that's going around has her in bad shape and being pregnant doesn't help any. So we spent about 3 hours at the hospital, an hour at the grocery story, 30 minutes waiting on her prescriptions, a 60 round trip drive into town and a few other things. Basically my saturday was shot to hell
Got up this morning mice and early. Cut down 2 trees for firewood and then the boy and I split it all.
Time to make 2nd pot of coffee
and get onto working on the K5
Got the soft top all installed, Looks good for a used top (pics tomorrow). Also put new floorpans in the passenger side, well mostly in. It's all cut to fit and screwed in with sheetmetal screws. Was going to get it welded in but shortly after I started the wire spool turned into a giant birds nest...dammit!!! Spent a few minutes or so trying to get it untangled and respooled. Decided I need a break so I took the bike for a spin down the mountain. Last weekadjusted the valves and did a few other motor mods and haven't rode it since so figured it was time. Plus it was 60 degrees today.
Tomorrow I pick up the hoses for the hydro steering. Was gonna get them Saturday but they were only open M-F......bastids
Also waiting on some price quotes for a fuel cell. Hopefully I can get the one I want and have it going by next weekend or so.
that will leave 4 BIG projects before April 22
1: Anti wrap bars
2: Rock sliders
3: Get my front detroit, drive flanges and 35 spline stubs installed.
4: Make a winch mount and give the new winch a place to sit
Got up this morning mice and early. Cut down 2 trees for firewood and then the boy and I split it all.
Time to make 2nd pot of coffee
and get onto working on the K5Got the soft top all installed, Looks good for a used top (pics tomorrow). Also put new floorpans in the passenger side, well mostly in. It's all cut to fit and screwed in with sheetmetal screws. Was going to get it welded in but shortly after I started the wire spool turned into a giant birds nest...dammit!!! Spent a few minutes or so trying to get it untangled and respooled. Decided I need a break so I took the bike for a spin down the mountain. Last weekadjusted the valves and did a few other motor mods and haven't rode it since so figured it was time. Plus it was 60 degrees today.
Tomorrow I pick up the hoses for the hydro steering. Was gonna get them Saturday but they were only open M-F......bastids
Also waiting on some price quotes for a fuel cell. Hopefully I can get the one I want and have it going by next weekend or so.
that will leave 4 BIG projects before April 22
1: Anti wrap bars
2: Rock sliders
3: Get my front detroit, drive flanges and 35 spline stubs installed.
4: Make a winch mount and give the new winch a place to sit


the wife can't be mad for too long 