MaxPF
1/2 ton status
Jason4x4 can stop bitching about it now 
Here it is:
I lengthened the front driveshaft by inserting a piece of 1.750" DOM which is itself sleeved with a piece of 1.500" 4130.
I also did some grinding on the CV. I measured 37 degrees of angle on the modified CV
Since I now had a front driveshaft I could flex my ride out for the first time since the lift and new tires:
Now that this is finished I can get back to the diesel project

Here it is:
I lengthened the front driveshaft by inserting a piece of 1.750" DOM which is itself sleeved with a piece of 1.500" 4130.
I also did some grinding on the CV. I measured 37 degrees of angle on the modified CV

Since I now had a front driveshaft I could flex my ride out for the first time since the lift and new tires:
Now that this is finished I can get back to the diesel project

I also found my stops are being wore away each trip out , so a little grinding may be in order . 
add a plate for it to slide on rather then coming to a sudden stop if you hit the rec 2x4 metal.