I recently picked up 8 feet of 2 inch .250 wall DOM for my lowers and 1.75 .250 DOM for my uppers. I know the uppers will be fine but for some reason im second guessing myself on the lowers. Lower link tube is right around 34 inches (without joints, ect). I find myself wanting to sleve these lowers (my neighbor works at a machine shop with lathe acess) with something like 1.5 .500 wall and make them something retarded like 2 inch .750 wall
plug welded every 6 inches or so.
Talk me out of all this extra work please
plug welded every 6 inches or so. Talk me out of all this extra work please



