Anybody ever done it? It has to be done inside the carrier. I think I have a pretty good plan of action by welding the bottom side gear and two spiders through two windows in the bottom then rotating the assembly 90* to get the other two spiders through the windows. Then installing the cross pins and working my way around them and the spiders finally installing the top side gear and filling the remaining voids. Here are a few pics of the carrier in order of assembly.





