adamforsythe
1/2 ton status
Well
it's been almost 2 months of sanding, painting, throwing things, spending a lot of money. But my 350 is all done. I just have to do a little editing to the y-pipe so that it can fit the headers. The best thing is I don't have to smell oil burning all of the time.
Thanks
Adam
it's been almost 2 months of sanding, painting, throwing things, spending a lot of money. But my 350 is all done. I just have to do a little editing to the y-pipe so that it can fit the headers. The best thing is I don't have to smell oil burning all of the time.
Thanks
Adam