CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.
Wow sooo you have 1 month to finish the front suspension, prep and install the rear axle, plumb up all your brakes, install the rest of the drivetrain, hope the driveshafts still fit, install the new fuel system, finish all the wiring, put the front clip back on, cooling system, test fire/run the engine, and fix any problems or bugs along the way.

Did I miss anything???

Ben you are awfully ambitious, but sorry I just don't see it

Some of those is being farmed out. The tuner emailed.me back it will be a few more weeks out.
 
Rear suspension will 've done this weekend. Then it will be a roller. Another weekend for the fuel system and engine. Then another for sheet metal. I think it is very possible. The exhaust and brake plumbing will he farmed out and hopefully done during the week
 
Why are you farming out brake lines? I feel like that's something that's easily done on your own :dunno:
 
Be the brake and steering lines. It being 2wd I had to cut back a bit.

And I tossed the power steering lines and thinking about going hydro assist, I have half the parts.
 
Once we get it a roller in one day we can take it to hos power to get lines made for brakes and steering, same day it can see the driveline shop, then drop it off for the gears.

I can have the drive lines delivered to Andrews shop too, so we maximize time.
 
Shouldn't need it to get the truck driving. I took my daily driver fund and have been waving it at this truck.
 
The date is set May 27th for the dyno. May the truck gods be on my side.


Here is a before shot.
IMAG0498_zpsbe2ywspp.jpg



And now a after shot.
IMAG0556_zps6kkefjrr.jpg


Much better!

Here is all the excess crap cut off, crazy to think I cut a brand new harness.
IMAG0557_zpsnrf9xwhg.jpg
 

Latest Posts

Top Bottom