CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

28 DAYS TO MOAB !!!

Re: 7 DAYS TO MOAB !!!

</font><blockquote><font class="small">In reply to:</font><hr />
PING! ZOWWEEE!! POW! DING! VVEEERRROOOM!! BANG! KERPLOWWEEE!! BAM!
AAAAAHHHHHHHHHHHH

[/ QUOTE ]

Yupyup, that about says it all /forums/images/icons/grin.gif

/forums/images/icons/crazy.gif MOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMOABMAOB /forums/images/icons/crazy.gif
 
Re: 7 DAYS TO MOAB !!!

...rear bumper reinforced... ff14b spiders welded and put back together... side mirror for tube door installed... tailgate speader bar thingy painted...

gettin tired!

J
 
Re: 7 DAYS TO MOAB !!!

Grinding done, still leaking oil. Swear I smelled coolant, can't find any leaking though. most of the check list done, most not. /forums/images/icons/shocked.gif Truck at cage builders. /forums/images/icons/confused.gif Need sleep badly.
 
Re: 5 DAYS TO MOAB !!!

old 1/2 ton front end stuff completely removed, zero rates added, ORD HD front shackles installed...

back to the garage! /forums/images/icons/shocked.gif /forums/images/icons/laugh.gif

J
 
Re: 5 DAYS TO MOAB !!!

Finished my floors, seats are in, wiring done, Hi-Lift mounted, built and installed the spare tire holder so now it's time to load, finish the trailer stuff and check out the tow van. More to go but I'm really close I think /forums/images/icons/crazy.gif . Hang in there Greg &amp; everyone, you'll get er done.
 
Re: 5 DAYS TO MOAB !!!

2wd steering box in, borgeson installed, front shock factory rivets ground...

J
 
Re: 5 DAYS TO MOAB !!!

Finally got mine finished in the Residence Inn parking lot yesterday. Had to get it mobile where I could move from TX to CO. Pulling it off the trailer I found out that my inner wheel seal on the 14b is out. /forums/images/icons/frown.gif Replace that, and I am ready to go!!! /forums/images/icons/grin.gif /forums/images/icons/cool.gif /forums/images/icons/smile.gif /forums/images/icons/wink.gif
 
Re: 3 DAYS TO MOAB !!!

Three Days to go and.............



IT"S ALIVE!!!!!




Started up the new engine last night for the first time about 9pm (the neighbors loved us! /forums/images/icons/shocked.gif ) and it looks like we have good oil pressure at the top of the engine this time!!

The front clip is re-installed, so it looks like a truck again, and I feel like it's coming together nicely. But there is still quite a bit to do:

Install new tires on wheels....can't drive to Moab on 29" tires!
Get 14BFF Re-geared for 4.10s to match front D60
Finish installing brake lines on D60
Install F*RD shock towers on front to hold 9012 Ranchos
Install CB
Install Front Recovery Point, and Bumper
Trim Fenders (ALL)
Create a rear recovery point if time allows...


I'm sure there's more to do, but the MAJOR stuff on the list (that HAS to be completed) is almost all done now. I still have all day today (Sunday) and all day tomorrow, and probably 1/2 day on Tuesday to resolve any last-minute bugs.


/forums/images/icons/cool.gif !!!!MOAB OR BUST!!!! /forums/images/icons/cool.gif
 
Re: 3 DAYS TO MOAB !!!

YES!!! It has a heart beat!!!
Keep going and don't give up!
We can work on stuff at camp too!
Gett the drivetrain and tires done first!
Off to Costco fer our grub!!
Keep ON Truckin!!!!!!!!!!\
YYYYYYYYYYYYYYYYEEEEEEEEEEEEEEEEEHHHHHHHHHHAAAAAAAAAAAAAAAAAA!!!! /forums/images/icons/grin.gif
 
Re: 3 DAYS TO MOAB !!!

GOOD NEWS !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
/forums/images/icons/grin.gif BUT DAMM YOU STILL HAVE ALOT TO DO
 
The new title says it all.......

We are down to the final HOURS to get ready!!! /forums/images/icons/shocked.gif

I leave for the axle shop/tire shop in the next few minutes....it will be the first time my truck has been off jackstands and out of the garage since July 4th weekend (about 45 days!)

Let's go folks.....if I can do this in time, you can too!!!!!! /forums/images/icons/cool.gif






ps. I am exhausted though....I hope I don't fall asleep on Dump Bump!!! /forums/images/icons/grin.gif
 
Way to go Greg.... /forums/images/icons/cool.gif

You're kickin' a$$ and takin' names.. /forums/images/icons/grin.gif

Marv
 
Tick Tock Tick Tock
I am board here at work!! I just wana DRIVE!!!!!!!
Tick Tock Tick Tock tick tock......
aaaaaaahhhhhhhhhhhhhhhhhhhhhhhhhh
I just did the last of my shopping at lunch so now all i have to do is take out my back seat and load all my stuff..................
board board board
MAOBMOABMOABMOABMOABMOABMOABMOABMOABMOABMOAB!!!!
 
I just neeed to load on Tues. night and head out Wens. am. I need to go pick up Matt with West Texas Offroad on the way so he can bring you guys a steering set up to win. Good luck to all of ya on the trip over. See ya in Moab. /forums/images/icons/grin.gif
 
how bout now greg?
how bout now?

tick toc tick toc tick toc

bing zap kaplowie dong zippie perklow ping bang BOOOM!

/forums/images/icons/grin.gif
 
The fawker better make it, I'm just dying to smack him for this post. Ohh I just love how he went right for the jugular with the whole hours thing instead of days now. I'm so anxious, I feel like throwing up.... /forums/images/icons/laugh.gif /forums/images/icons/laugh.gif /forums/images/icons/laugh.gif
 
I hate answering for people but he is gonna make it /forums/images/icons/grin.gif .I just talked to Burt4x4 and he said Greg is just finnishing up a few little things and will be heading to Burts tonight and they will be headin out in the morning /forums/images/icons/grin.gif
 
Top Bottom