CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

28 DAYS TO MOAB !!!

Re: 10 DAYS TO MOAB !!!

Do you think you will have the motor done in time?
Also did you get the 35 spline swap done? Do you still want me to bring my extra 30 spline stuff? /forums/images/icons/wink.gif
 
Re: 10 DAYS TO MOAB !!!

STOP THE INSANITY!!!!! /forums/images/icons/laugh.gif

I have the new between the rails (23 gal K5 tank) installed with custom modified Sub cross members. Still got to plumb/wire the tank, build a battery box inside the cowl, mount/wire tail lights, adapt a tow bar (Thanks Marv and Allan!!!), fab a new mount for my rear shocks (gas tank is where they were last time), fab some sort of axle wrap control, build a dash, ... hmmm, seems like I'm leaving off a few things, but you get the picture... /forums/images/icons/crazy.gif /forums/images/icons/cool.gif
 
Re: 10 DAYS TO MOAB !!!

I got the stub shafts and u-joints already from ORD....those u-joints are HUGE (1480s?)

I'm glad I did a complete teardown of my D60...the previous u-joints looked fine, but the were rusted solid with NO grease in them!!! Took a while to drive them out but it's all good now with big 'ol honkin 35-spline outers.

Now I just need the WARN hubs to arrive along with the new D60 spindles and I will have a complete front end. I did get the entire housing stripped and painted over the weekend and it looks SWEET!!!!! /forums/images/icons/cool.gif
 
Re: 10 DAYS TO MOAB !!!

Cool I will still bring them just in case you don't get the hubs and you never know how will need some help. As far as the U-joints yep they are huge. The inners did you get the newer style that does not neck down or did you use the old ones that neck down. If you use the old style that necks down then that will be your weak link and you don't want to break an inner shaft because all that metal could get in your diff. and that would suck buy not as bad as needing to remove the diff. to get the shaft out of the locker. Hey boss man I'am not telling you any thing but just giving you my two cent. Please don't spend it because it is all I have. /forums/images/icons/grin.gif
 
Re: 10 DAYS TO MOAB !!!

Man, Greg and Russ, you guys have alot work to do. I hope you're able to get it done and test the new stuff before you get to Moab. Cool stuff going on your trucks/forums/images/icons/smile.gif. Now get back to work.../forums/images/icons/laugh.gif
 
Re: 10 DAYS TO MOAB !!!

Had a good day!
Got the gas tank skid DONE mounted finnished!! /forums/images/icons/cool.gif /forums/images/icons/cool.gif
Now I wont hurt my new 37gal tank, very cool that sucker wasn't cheep!
My rock sliders are DONE too!! /forums/images/icons/cool.gif /forums/images/icons/cool.gif
MOABMOABMOABMOABMOABMOABMAOBMAOBMOABMOAB
YYYYYYYYYYYYYYYYYYEEEEEEEEEEEEEEEEEEEEEHHHHHHHHHHHHHHAAAAAAAAAAAAAAA!!!
ok bed time i'm outa energy! /forums/images/icons/shocked.gif
late
 
Re: 10 DAYS TO MOAB !!!

I'm glad I'm not the only one stressing. /forums/images/icons/tongue.gif I got the rock sliders capped and ready to grind/mount the floor to, today. /forums/images/icons/grin.gif I just need three more weeks to finish........DOWGH I mean a week. /forums/images/icons/wink.gif
 
Re: 14 DAYS TO MOAB !!!

I thought that I was cutting it close before /forums/images/icons/shocked.gif ! I installed my "new" transmission on friday (my birthday) and after 40 miles it lost 2nd 3rd 4rth and reverse /forums/images/icons/mad.gif /forums/images/icons/mad.gif !!! Now I have to get another one built and installed this week and my front axle is just barely going in to get regeared. I'm starting to stress out!
 
Re: 8 DAYS TO MOAB !!!

There are exactly 7 working days until most people leave for Moab. Only 1 weekend remains!

My engine STILL is not put back together, and my D60 is still in pieces with no spindles or locking hubs.....

If I'm going to WALK to Moab, I'd better start soon.



/forums/images/icons/shocked.gif
 
Re: 8 DAYS TO MOAB !!!

Just don't build it too fast! Small mistakes are not acceptable /forums/images/icons/shocked.gif
I'm sure it will all work out fine!
tick tock tick tock
 
Re: 8 DAYS TO MOAB !!!

oh good gawd am I tired!! mon-thurs I work 8am to noon... and then from noon to 9:30 pm or so I work on my truck... the rest of the week its been sun up to sun down every day. Hope I dont die of exhaustion before BB even arrives, LOL! think I am gonna make it tho... 14b rear is in, roll bar in, tube doors on, tailgate support bar thingy on, seats in, harnesses in... now I just gotta take care of the front axle... and its all down hill from there...

J
 
Re: 8 DAYS TO MOAB !!!

Sweet! Keep up the good work!
When you get to the campground I will have a cold one. or two, for ya!!
MOABMOABMOABMOABMOABMOABMOABMAOBMOABMOAB!!!!!
 
Re: 8 DAYS TO MOAB !!!

Dude! Thats alot of stuff DONE /forums/images/icons/grin.gif I'm not getting my cage, seats, harnesses in till sat. /forums/images/icons/shocked.gif AAAAHHHHHH! My floor will be done tonight. I got the sliders done, and some other small stuff. Still a few weeks worth of stuff left. /forums/images/icons/tongue.gif
 
Re: 8 DAYS TO MOAB !!!

lots more to do tho, shop cant put the tcase in until monday morning... so I'll do the D60 thursday-saturday... get shafts late this week... and be full 1 ton by monday night. still gotta break in those gears.... lol!!!

tiiiirrrrreeeedddd!!! /forums/images/icons/smirk.gif /forums/images/icons/confused.gif /forums/images/icons/crazy.gif /forums/images/icons/frown.gif /forums/images/icons/smirk.gif /forums/images/icons/shocked.gif /forums/images/icons/confused.gif

J
 
Re: 14 DAYS TO MOAB !!!

I'm gonna make it /forums/images/icons/laugh.gif !!! Got my old trans rebuilt yesterday and installed (with new torque converter) today /forums/images/icons/cool.gif ! Taking front axle out and having gears installed tomorrow!! I was starting to get worried for a while there /forums/images/icons/shocked.gif Now about that gas money...
 
Re: 8 DAYS TO MOAB !!!

Got the floor done just about 10min. ago. /forums/images/icons/shocked.gif WOW. Now I have a New oil leak! and I think I'm hearing the beginnings of an exhaust leak. /forums/images/icons/confused.gif I NEED to sleep for like a week........... /forums/images/icons/grin.gif Its all in the name of MOAB. /forums/images/icons/cool.gif mustsleepsoonneedtogonitenite
 
Re: 7 DAYS TO MOAB !!!

By this time next week....the Moab caravan will be underway!!! We'll have been driving for about 3 hours already.....

I don't know if I'll be driving or riding "shotgun" yet, but I'll be there one way or another.


Can I get a YEEEEEEEEEEEEEEEEEEEEHAAAAAAAAAAAAAAAAAA??????

/forums/images/icons/grin.gif
 
Re: 7 DAYS TO MOAB !!!

did you see my skid plate I made?
Oh and here you go
YYYYYYYYYYYYYEEEEEEEEEEEEEEEEEHHHHHHHHHHHAAAAAAAAAAAAAAAAAAA!!
 
Re: 7 DAYS TO MOAB !!!

WOOHOO-WOOHOO-WOOHOO-WOOHOO-WOOHOO-WOOHOO-WOOHOO-WOOHOO-WOOOOOOOOOOOOOOOOHOOOOOOOOOOOOOOOOOOOOOOOOOOOOO!!!! /forums/images/icons/confused.gif /forums/images/icons/ooo.gif /forums/images/icons/shocked.gif /forums/images/icons/grin.gif /forums/images/icons/tongue.gif /forums/images/icons/crazy.gif /forums/images/icons/smile.gif /forums/images/icons/cool.gif /forums/images/icons/blush.gif
 
Top Bottom