starting to get a tiny bit worried on my dead line..
only a few thing to do still... in two weeks..
front shock mounts..
rear shock mounts...done
rear brake lines....done
cut off and re weld spring perches..done
change diff fluids
pick up the tires.....done
find rims.................done
prep and herculiner interior..
paint interior...done
paint truck..
pick up the doors from powdercoating...done
finish rear bumper..add hitch
change u-joints in rear shaft...done
build front shaft..
drill holes for cage
swap on tbi
inline fuel pump
inline line brake
install dash..
front end pieces/lights/grill
get tags
and have exaust done
install powersteering pump and lines...done
swap tie rod
instrall dash parts
finish brackets rods for hydro clutch
mount tool box/amo can
build spare tire mount
build front bumper of some sort
install bew radiator
install water pump stud kit
install overflow bottle
install front recovery hooks
tighten pitman arm
put straps on rear d-shaft
make spare d-shafts..
fix rear wiring...
install mirror
install interior light
imstall minimum 2 rock lights
wire up bmw side lights
install tail lights
install head lights/buckets retainers/adjusters
find wheel wheel trim and modify
get line lock and install
restrainten/dye install dash
also moving in the next 20 days.. and working my job, plus helping out another persons customers since he is having heart surgery..
who wants to start placing bets?