ok, here's what I've been working on the last couple days.... sorry for the load time....
fresh out of the blast cabinet....
zinced....
and so the bumper begins....
first thing was filling and smoothing the frame holes.. new ones are needed for the bumper...
I cut some slugs out to fill the holes..
finished horn..... the blue line is where I needed to trim the horn to, to make it flush for the bumper......
zinced....
then I needed to make the inside clevis mount... 3/4" stock... 1 1/4 clevis hole..... 1/2' bolt holes...
mocked up for trimming... hardware will be 1/2" fine thread.....
mocking up the side skid mount flange...
B-52 trimmed...
3/16th's gap that needs to be filled...
fill piece with weld-thru primer...
parts too...
my version of a lam bolted back up... chamfer cut for double bead....
shaped.....
zinced and on...
outside... dont mind the hardware....
most of the other side is to this point.... just need to weld it and shape it to get it as far....
the next step is to build the lower section and skid tabs, tieing the 2 sides together...
hopefully I'll be ordering tube this week to get going on the top... in the meantime, I'll build the removable skid....