Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.
They are basically temporary attached at the front. Going to stay that way just have to mount them permanently. The rear bottom of them is where they were before top is now just where it looks like should be.
Not sure what I am going to do with the sheet metal pillar in the back. Will have to see what it looks like with it cut off. When we did the rear cage we forgot to follow the original lines of the rear doors. really do not want to redo the tube so will have to see what it looks like.
A and B pillars are getting narrowed. Boatsiding is next. If the rain stay away Thursday I will start that. If it rains I am going to go get the tube for the cage.
If I can sell the doors the front will get linked.
Next went to work on the roof. Neighbor has a plasma cutter. Those things are fun took a bit of practice to do it pretty good but seemed to work rather well. Skinned the roof off the structure going to re use that. Some parts of the side are going to get cut off and used also. Just not sure what yet.
Next I went to work on the rockers. Got them almost all they way done. Have to cut a bunch of the floor still but going to do that once I get the square tube cut for the sliders.
Ordered my tube for the cage will hear 3-5 days 5-24 ft, 1 3/4 Hrew, 2-20 ft 1 1/2 Hrew, 1-20 ft 1 in. Hrew
All for a grand total of $211.15
I already have one stick of 1 3/4 so that will give me 6.
I also have the square tube for the sliders just may need to get some more for the runners off the sliders. I have some but they may be thicker then I want to use.