Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.
I only have 1 week left to work on it then I go back to work in ND for 16 days then 2 days to work on it again then Moab! May 11th to the 17th is the Moab trip, it will not be done but it should be drivable to see how everything works.
Thanks, I will get better pictures for ya but this is what I have now, sorry. I decided to beef up the Shifter and got a gauge cluster made. One open hole is for a fuel gauge and the other is for the rear ARB when I do it.
I have video of my motor Dyno now! Go to this website http://www.ltsmachine.com/#!555-bbc-project and you can see the pictures then goto videos and look at the 555BBC. Thats my baby!
Thanks guys! I just picked up a new camera so I should be able to get better pictures when I get back from work. I leave tomorrow for 16 days then have 3 days to finish things up then Moab baby!This has become a job since I have a timeline. I can not wait to go play!
Going to drill the stock intake to fit the old style heads. Won't run like yours but should be ok. Weighed it today on the way out of town it's a heavy old girl. 6328 without my butt in it
Maybe both of you need to go on a diet!I hope mine is around 5,800lbs and that will be the same as yours with my butt in it, Lol
I got the right Headers in today so the Exhaust will get done only one time now! The new 17" X 12" Stazworks Double Beadlocks with 44" Pitbull Rockers should be in Laramie on Friday!Everything coming together now!