OK, sorry for making you guys wait a bit but wanted to get a good picture of a production unit or two. The prototype has gotten hashed over and rehashed just a few too many times.
Front with tie rod clearance on the left.
Rear or histeer on the right.
All grade 8 hardware included. Locking flange bolts.
Front with tie rod clearance on the left.
Rear or histeer on the right.
All grade 8 hardware included. Locking flange bolts.

Last edited: