I was digging through some old cds and ran across some early pics of my virgin K5. So here is a time line in pictures from where I started to where it is today. Yes I'm a pic whore.
Here it is the night after my first stuck. Was side ways in a ditch up to the mud line. Notice the nice fender rot around the wheel wells.
4 days later......New 6" lift and 3/4 ton axles
This is the diesel donor tub sitting on stands.
Prepping for tub removal. My friend and I snatched it off with the tractor and boom.
Bare frame waiting for a tub that night.
Next evening wired and ready for the front clip. We just rolled the chassis under the other body and bolted it up. 2" body also installed
Testing with first bumper design. Also no longer can see through the floor board.
mostly the same color now
new shoes and seats. Changed bumper angles.
Fun at Uwharrie
That is all......
Here it is the night after my first stuck. Was side ways in a ditch up to the mud line. Notice the nice fender rot around the wheel wells.
4 days later......New 6" lift and 3/4 ton axles
This is the diesel donor tub sitting on stands.
Prepping for tub removal. My friend and I snatched it off with the tractor and boom.
Bare frame waiting for a tub that night.
Next evening wired and ready for the front clip. We just rolled the chassis under the other body and bolted it up. 2" body also installed
Testing with first bumper design. Also no longer can see through the floor board.
mostly the same color now
new shoes and seats. Changed bumper angles.
Fun at Uwharrie
That is all......
