CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

Made some progress these past few days...

zakk

1/2 ton status
Joined
Sep 21, 2001
Posts
4,762
Reaction score
0
Location
San Jose CA
cases_001_resize.jpg


a good scrubbing on the 203 range box and a bead blast on the 205 and it'll be ready. ORD input and output shafts are hopefully going to be shipped monday, along with the shifter kit.

It's getting there...
 
Right on. /forums/images/graemlins/thumb.gif /forums/images/graemlins/k5.gif
 
Scott came over and brought his OBA and it came apart fast. the only problems will be getting the shifter pins and the 15 phat bearings back in. Outside of tool runs, only took about 2 hours.

Going to go oven-clean (with new lemon scent!) the 203, and get that ready...
 
Top Bottom