OK, I know I've kept a few waiting just a little too long
so here's a snap of the first one off the fixture not more than a half hour ago.
Pricing structure will be the same as the 1/2 and 3/4 ton flip-n-switch.
so here's a snap of the first one off the fixture not more than a half hour ago.Pricing structure will be the same as the 1/2 and 3/4 ton flip-n-switch.