same here... 4 hours later im like wow! 


Coolio. Those polks I have heard good things about. I'm eventually gonna spend some money. I like having good sound in the shop.






Still a few more weeks out .....I'd guess at least Memorial Day (if not Fathers Day) before actual truck work starts up again.
Current Punchlist is as follows:
1. Get 100 shiplap boards painted (KILZ) prior to installation on ceiling. Painting after installation will be at least 10X more difficult.
2. Install shiplap in all ceiling areas
3. Finally, cut out rafters and re-frame lower ceiling area to officially "vault" the double-bay side.
4. Finish the miscellaneous plywood flooring work in the upper areas to create storage bin space.
5. Install more T&G on underside of ceilings around perimeter lighting areas. Install ceiling speakers.
6. Install T&G wall on left side of garage to match the completed side on the right.
7. Install the 2nd LiftMaster 8500 (door opener) and run all remaining wires
8. Frame up "sound proofing wall" against rear of shop to block noises into house.
9. Finish wiring up 220V outlets and breakers in panel.
10. Put away all unnecessary items that are taking up room into the overhead spaces.
That doesn't include things like installing the AC Mini-split.... which isn't critical (yet) and can be put off for a little while longer.
-G

how close is the k5 to being done?
You’re in good company....looks like I “misunderestimated” the timeframe...
2018.07.04 - UPDATE !! - 4X4HIGH ON THE 4TH !!



Flip flops and pink shorts......
Nice... lol![]()
Couldn't have picked a better day to be here. Cause man it's been hot and man was it nice today. Did you get AC in that shop yet?