Thanks. What I haven’t documented is all the welding I had to come back too after the fabrication. I still have an estimated 6 hours of sheet metal welding. The rear suspension and bumper needs almost all the welding done. The rear shackle hangars are tack welded and with the added leaf in front need to be cut off and moved 1/8” rearward. That tiny amount will pop the backend up 3/4” or more. Shock mounts on the rear axle don’t exist as do the entire front shock mounts. Then there is the 8 sticks or so of 1080 DOM 1.75 tube to bend up for the cage.Nice progress.
Last edited: