Drivers side water line is on for the most part. Goes from the engine bay all the way back to the bed. Just gotta decide how to make the transition from outside the frame to the inside and make a crossover at some point. Might be able to finish this one up today.
The a pillar bars are finally tied back in to the rest of the cage. Was an interesting chore. In the end a bunch of W.A.G. got the job done on the first one and the second was patterned after it. Can't say enough about keeping tube work as symmetrical as possible from one side of the truck to the other. It's so helpful when you can design one tube and mirror it to the other side with no measuring needed.
In the interior of the cab, all that remains is a camera and monitor mount. We'll eventually have 3 CC cameras mounted on the rig. One is a basic review mirror type setup and the other 2 will be down in the chassis facing forward and rearward. Pretty close to some paint and bedliner here.
The big news for the rig is its about time to do some flexing and checking out shock mount and bump stop locations for interference. I don't expect to see any but its gotta be checked. We're really close to pulling the bed off and doing some finish work. That'll be a red letter day!!!