Slow progress is still progress, right? Got the clocking installed and only needed to modify the crossmember, still need to get longer studs to mount my cable shifter as the ones that come with it aren't quite long enough. Also need to order a new driveshaft, was hoping the one I had would work, but no dice. It's just long enough to move the burb to a more permanent spot to work on it.
Got the turbo pulled and sent in to be rebuilt after moving the burb, and modified the seat brackets to fit the center console. Still need to drill out the front mounting locations, but at least she's in place now.
Also ordered a new rear driveline, got my PSC gearbox, and the calipers from PowerStop arrived!! Need to pull them apart and repaint though as they're red and my accent color is blue, lolol.
Trying to decide if I want to do studs now or wait. I've got some dangerous idears rollin around my noggin. And if I do any of them I'll need to pull at a minimum everything to get to the pistons to install 18:1 pistons vs the 20?:1 that's in it now.
That's a problem for future me to decide on. Right now I need to finish getting it trail ready. Heading to Moab the week after Jeep week with the family. Still need to finish the console install (including tcase shifter), OBA, suspension testing (bumps, front driveline, possible limit straps, and possible shock move), sliders, hydro-assist, and install the turbo when I get it back.





