K5 Jess
1/2 ton status
Subbed 


2k for thatgreat deal!

You "stole it"
awesome score and some nice additions!
Subscribed!!
i love both of the trucks!
.Great to see updated wheeling shots...
Justification for building a very capable rig!
Love it!



)
. Just about everything was done with harbor freight tools. Final welding is done with my brothers 220 welder. I'm not totally done with tubes on the abomb. I plan on connecting some more tubes on the lower part of the abomb up to the main tube and maybe some tubes on the inside part of the abomb and connecting out to the main tube (if that makes any since). If it doesn't, just look at ORD's low profile bumper and see how all their tubes come together, and that's pretty much what I will try to do, but in a modified way. However this will probably wait for a while. It has been freaking cold here and I am sick of cutting tubes in the cold weather. So maybe over the summer I will add these others. What do you guys think so far?Are you bending tubing or pipe?