just to give a hint of the insanity... that's one bottom of 4 sides... that prolly had 2 hr's or so of flatpadding with the DA, from a quick 80, than 220 the hell out of it... than 320 and a bit of 400 to bring those 220's circ cuts out.....
than it get's that block 220 work, even than it's a ton to get those 400 DA's out.... I will prolly have 3 hr's of 220 wet, followed by an hr with the scotchbrite.... it's ridiculous how much work it is cuz it's metal i'm sanding, not a paint, etc... that black in the water is alum...
x 4............. and the tops i need to be even more anal with.....
the coating will be almost a week, mainly cuz i can only do one side at a time on those big panels... so each side will be prolly 12 to 15 hrs each....... x 4........
