85mudblazin
1/2 ton status
Well all of the tube work is done minus 2 bars that wont take but 30 min. Been working forever on the dash area. Its done for the exception of the tabs to hold my lexan panels and make a frame to hold my guage/switch panel I made. The I can finally tear it all down and paint
The panels will be removable to get at the wiring and such so heres what it looks like with them off.
The panels will be removable to get at the wiring and such so heres what it looks like with them off.



