2010.03.01 - UPDATE! - SHOVE IT!
I'm out of space (again).
The project has reached a point where I really need to get to the centermost part of the frame to get the crossmembers designed and built, and crawling around under the body and banging my head on it has gotten really old.
Tonight, I had no choice but to reconfigure the Man Space to get myself a few extra feet of working room....
Step 1: Move toolbox and drillpress from end wall... this allowed me to roll the body about 6 more feet until I basically hit the back wall of the garage.
Unfortunately, this move alone did not get me enough real working space so I had the unfortunate task of moving the frame ALL the way back to the rollup door..... which meant that I had to re-level and re-plumb the frame, and set the correct frame height all over again. What a hassle...
At least I was able to get a nice side-profile of the lower suspension links and frame for reference later on....
The payoff at least, was that now I had great access to the center of the frame where the lower rear links will be converging, as well as the lower front links. This will make it substantially easier to plan for the crossmember and check various clearances.
It was also a good time to double-check all of my bodymount specs to insure that the spacing was exactly as described in the Factory Manual. With some scrap lumber and ratchet straps it didn't take long to get each position accurate to within 1/8" of the original spec.
It's been tedious getting all of this stuff rearranged, but the alternative of crawling under the tub for the next few months was even worse... progress should start to get quicker again now that I've got a simpler work environment.