Mike’s ‘72 K5 Build Plan
My plan is to add to this/adjust as I go. I just wanted a rough timeline to get me thinking, and to spark any comments/suggestions from other K5ers. I actually thought about putting it in Project.......but then I realized that was nuking it out a bit much. That first window may be a bit too short, but I should have a good idea by the middle of February. Also, with a new job coming up, I really don't know what to expect for 'free time.'
Hopefully I can start building a parts list (with prices) tonight.
Suspension [01FEB16-01APR16]
- Disassemble entire front and rear suspension
- Remove both diffs
- Remove old exhaust
- Drain/remove gas tank
- Cut off tow hitch and all ‘extra’ steel
- Remove bumpers
- Remove old gas line
- Remove all wires underneath
- Make plate(s) to cover holes for heat/A/C box on firewall
- Clean/wire brush/sand (Now that I have spent a few hours under there looking, I realize this is a MUCH bigger task than I originally guesstimated)
- Firewall
- Frame
- Diffs
- Underneath/Rocker boxes
11. Remove old body bushings and replace with new (one at a time) [which type?]
12. Install new gas tank, including sending unit
13. Paint entire frame/diffs/underneath (What type of paint?)[buy a spray gun, or use rattle cans?]
14. Install new springs/shackle flip/shocks/pitman arm
15. Install new wheel bearings
16. Reassemble front end/steering with all new bushings
17. Install new brakes/rotors/drums
18. NP205 - drain, fill, new gaskets in adapter, paint
19. Install NP205
Remove all existing wiring/fuse panel
Install new wiring harness/fuse panel
Engine[01APR16-01JUL16]
- Assemble crate motor
- distributor (HEI)
- starter
- harmonic balancer
- water pump
- intake manifold
- Carb (or EFI)
- set timing
- plugs/plug wires
- oil filter/oil
- exhaust manifolds
2. Install NP205
3. Attach transmission to engine, install both
4. Install new exhaust pipes, with new exhaust hangers
5. Install new mufflers (want aggressive tone, but comfortable volume)
6. Install driveshafts
7. Clean/paint front support
8. Install front support/new radiator
9. Connect all wires to engine
Body[01JUL16-01JAN17, due to $$$$]
- Remove seats
- Remove Roll Bar
- Remove gage panel/AC controls
- Remove mirrors/door handles/wing windows/lock cylinders/all lights
- Remove old tailgate
- Install new tailgate
- Install new bumpers
- Send to body shop (paint it the stock white, with everything else blacked out)
- Send to powder coat (black)
- new bumpers
- wheels
- roll bar
- door handles/lock cylinders
- all light trim
- mirrors
- wing window frame
- grill/all grill trim
10. Install new gage panel/reinstall AC controls
11. Install all new knobs, turn signal arm, etc
12. Install new (stock) steering wheel
13. Wire interior
14. Install sound/heat barrier
15. Install new carpet
16. Install roll bar
17. Install new seats/center console
Have 35X12.5 15 tires mounted (The most aggressive looking ones I can find)
[15JAN17]
Black lug nuts
Bikini top (with kit that allows you to use existing holes/no snaps)
[01MAR17]