Moved my truck to the back carport. Finishing the little things takes a minute from here on out. Need to mount the hydraulic pedal kit and hope it plays nice.
Installed my new lid and shift. And rear driveline is in. New front one from Tom woods will be here Monday supposedly.
Mandatory pics incoming.
Dumped 120$ worth of Redline MT85 in the nv4500.
Also ordered a stock “cucv “ np205 steel skid plate to just bolt in place until I get even more serious. Probably have my buddy fab something super nice around the transmission and t-case.






Installed my new lid and shift. And rear driveline is in. New front one from Tom woods will be here Monday supposedly.
Mandatory pics incoming.
Dumped 120$ worth of Redline MT85 in the nv4500.
Also ordered a stock “cucv “ np205 steel skid plate to just bolt in place until I get even more serious. Probably have my buddy fab something super nice around the transmission and t-case.
Last edited:
