CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

Another broken axle shaft.........

I'll find it for you. I'm going on shift in 5 min though.

Oh and its a 50% rotation job as well. So you only work 1/2 the year.

Sent from my Desire HD using Tapatalk
 
We got our hauler back tonight though........ Nothing like a 100ton haul truck with a gooseneck trailer lol! It's a 777 Cat converted to puller. hauls the D11s around on.


d15b6bdc-b349-6237.jpg


d15b6be1-dfc1-53bc.jpg


d15b6be1-dfe9-6128.jpg



Sent from my Desire HD using Tapatalk
 
Last edited:
They had one of those at the Kayenta mine....Can't remember the truck model # for sure but I think it was a 789. The trailer was "ramped" on one side so the dozer could walk right up on it.
 
The rear is beavertailed. The 11s selfload straight up between the duals.

Check out www.tradesecrets.org for a start. You can get to the apprenticeship board through there im pretty sure. There is a journeyman equivalency exam, I've seen guys take it.

The fact of the matter is, they need tradesmen up here and are willing to pay. There is so much expansion on the books that this is how it is right now.

Sent from my Desire HD using Tapatalk
 
Last edited:
The rear is beavertailed. The 11s selfload straight up between the duals.
I see that now...the rear of that sucker is WIDE!
Check out www.tradesecrets.org for a start. You can get to the apprenticeship board through there im pretty sure. There is a journeyman equivalency exam, I've seen guys take it.

when the contract rolls over in Feb, J-man rate will be $55.09 The fact of the matter is, they need tradesmen up here and are willing to pay. There is so much expansion on the books that this is how it is right now.
Thanks for the info! Gonna look into this for sure....
 
Hey no prob. I'm a supporter of alberta resources. The oilsands gets oil out if the ground with shovels and trucks, instead of a drilling rig and pumps. It's a unique place where oilfield and mining come together.

Theres nothing on the planet that's harder on machines than oilsands. For instance, cutting edges on a 24H grader in the winter will last 1 day. Dozer undercarriages 4 months.

Sent from my Desire HD using Tapatalk
 
Do they have there own Power Plant at the mine our are they conected to the grid?
 
We are not on the grid. This site produces oil, diesel, and coke as a byproduct. power gen burns the coke. The big shovels are all electric, 13,800 volts. And of course all the plants usage.

Sent from my Desire HD using Tapatalk
 
Cool, Maybe I'll look into the power house and see if there hiring!
 
On that Haul Truck thats been coverted to haul the D11's, Are the trailer wheels powered?
 
It's a permanent 4 way king pin trailer attached. they're 6" pins.

Sent from my Desire HD using Tapatalk
 

Latest Posts

Top Bottom