Hopeful plans for the winter beyond the trans swap.... Pluck at what I can, and see what I have time for.
1. Change front springs out, putting stock diesel springs back in, and cutting them to the height I want. (1" higher.)
They will also add spring rate. Because right now even with coil sprung load helper shocks the front feels like it's on under inflated air bags. Soft as F*** and bouncy
2. Change rear driver's door so no more dent.
3. Replace lower rear quarters behind the wheels, And the little fang area right in front of them.
Maybe the rockers too. Though I may wait on those.
4. Modify new front fenders to clear tire better and install them.
5. Deal with old roof rack mounts in some way. Probably grinding them all out and filling them as Brian (
@beags86) had tried talking me into before. Lol . I think I came up with a good plan on how I could do it without causing bass rattles due to not being able to retrieve some of them when they fall into unreachable places.
6. Remove all side moldings and prep for paint in the spring
7.....? And MAYBE, if there's time in-between where I'm waiting on chit or anything, I may start on the center console. Which will have a place in it to hold a bottle in case I ever decide to spray it.
Most of these beyond the roof, and center console shouldn't take THAT much time. But winter is also my OT season, so

. Who knows how much time I'll get really.