it's been a while since I updated. I've got quite a bit done and I felt like I was on the home stretch until I made my to do list.....

But we'll see what happens. I'm hoping to have it for King of the Hammers and definitly by TDS. I'll post pictures tonight of the progress but just to keep me honest with progress here's the updated to do list:
Left to Do
-------------
Rear Shock Mounts
cut floor
fab upper mont
Brakes
attach pedal
brake light wiring
Possibly need new soft lines--curretn may be to short
attach/bleed
Exhaust
Fab temp exhaust out of old from Jimmy
check on condition of hangers--may need to order them
have muffler
Trans Shifter
temp attach to trans hump
run shifter wire---drill hole in hump
attach linakge
Trans Hump
find the bolts and re-attach
well in patch panels where it was clearanced
Torque converter
cut down bolts to fit
Battery Mount
Fab firewall mount
Or
check junkyard for radiator mount
Fans
fab mounting for fans
picture saved ck5
Rag Joint
grab one at Junkyard
OR
possible XJ shaft on its way
Radiator
fit hoses
mount overflow
Air Cleaner
new K&N
Vacuum lines
attch all lines
diagram saved
Wiring
switch panel
battery switch
headlights
rock lights
fans
tail lights
gauges
tach
gas tank
etc.....
250 crossmember
Fab torque mount
203 crossmember
use existing holes
need bushings
fab mount
Hood/Fender
cut inner fenders foe shock towers
attach all
Attachment points
fab front and rear
only temp until bumpers go on
Transmission lines
New rubber lines about 12inches longer
cooler attachment
Fuel Lines
attach lines at the pump
Power Steering
lines at the pump
lines at the steering box
Cage/Dash
Seats/Belts
Tailgate
Windshield
swap with one in Jimmy
Gas Tank
soft vent line
cut out patch panles
re-attach filler neck
new locking cap
skid plate on tank
Front end Alignment
King Pins
grease fittings
Master Cylander/Booster
need new nuts
Steering box
need new nut for top cap
swap end cap
drill and tap top
Hyrdo Assist
mount ram
attach lines at box and ram
Bump Stops
fab longer mounts