CK5
Register an account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members.

Roll cage kits Updated: last install video uploaded

Cage kit, through the dash or in front of dash.


  • Total voters
    38
  • Poll closed .
Welp, I threw my name in the hat this am so big changes coming for my K5. Front half first, then some measuring for and ordering the back half asap.
:woot: :saweet: :weld: :grind: :hack: :woot:

I wonder if Kert would open charge accounts for us? It would probably be simpler to have the continuous buy / pay cycle like a tool truck. Everybody wins! :doah: :haha:
 
Welp, I threw my name in the hat this am so big changes coming for my K5. Front half first, then some measuring for and ordering the back half asap.
:woot: :saweet: :weld: :grind: :hack: :woot:

I wonder if Kert would open charge accounts for us? It would probably be simpler to have the continuous buy / pay cycle like a tool truck. Everybody wins! :doah: :haha:

great idea, however we all would be broke!!
 
Second segment is done best I can do. Some of the video was corrupted. I think it still contains all the relevant info.
 
Some of our footage was corrupted on this segment. The actual lifting in of the halo.

 
Last edited by a moderator:
Video looks really good! Can't wait for the next segment. :thumb:
 
I'm seeing some "sweet" roll cage parts moving through the process.
 
:woot::woot:I got a tracking number. I got a traciking number. I got a track number. :woot: :woot:
 
Kert, I can't remember... Height-wise is the B pillar cut to fit or ready to go?
 
Kert, I can't remember... Height-wise is the B pillar cut to fit or ready to go?

sorry I didn't answer this last night. Fell asleep in front of the TV laptop sittng on my lap.:whistle:

B-pillar is installation ready. Only tubes that are designed to be cut for installation is the A-pillar bars. Start with the B-pillar and work your way forward.
 
Great, thanks! Trying to get the order of events right in my head, cut the roof first or mock up the cage so I can order the rest of it.
 
I want to cut first and mock up second but that means I've got to coordinate with someone else's busy schedule. :doah:
 
I want to cut first and mock up second but that means I've got to coordinate with someone else's busy schedule. :doah:

You're removing the entire top up to the windshield frame?
 
You're removing the entire top up to the windshield frame?

Yeah, I've always wanted to do a full vert conversion and this seems like a good time. I've got a '75 windshield frame already.
 
Last edited:

Latest Posts

Top Bottom