sandawgk5
3/4 ton status
I guess I will make a ground wire tomorrow and run it from the open post to the body ground right below it. Or should I run it to the common battery ground farther down?
Dik
Dik
for those who haven't had the soldering tutoral..
put lug in vise facing up. strip wire. dryfit wire in lug, take a few strands off if needed.. slide shrink down wire. coat exposed, tinned wire with flux using a twisting motion. put small glob of flux in lug. heat bottom of lug, filling lug about 2/3 up with solder. keep solder liquid with heat to lug. stick wire in.. melt any dribbles.. pull shrink up and shrink...
. I thought it would be bad to do that. I will try that with my charge wire when I make it. I have decided to run it this way and when I get signs of deterioration I will measure the cables and get some custom ones made up. I did not have a good morning yesterday and today my hands hurt because of it
. I will get a ground on that slave when I get home and hopefully it will fire right off. Thanks for the help guys.
. I moved everything over 1 and it fired right up. I am thinking of adding a toggle switch to the ground for the solenoid to act as a redneck form of theft deterent.
. 
\Pretty slick. Where did you pick up the battery cabling? If you posted it, I missed it.

How's this holding up? What's the model number on your batteries? Could you give me some dimensions so I know if they will fit in my JEG's battery trays