so... in light of the impending pooch, and evaluating how busy my upcoming year is going to be with training and bonding with my new best friend, I've decided THE #1 project priority for Mutt come spring/summer will be the kennel... the fuel tank, dual bats and finishing the service drawers will have to wait...
money-wise isn't too bad hopefully.. pair of wide, tall PRP's is gonna be like $750.. steel, and some alum, bedliner, etc... so all in, should be the 1200 to 1500 range... it'll be more banging out a full floor fab labor issue...
not only do I need to cut the whole floor out and fab the new, mount seats, divider wall, but that also involves making the grates for the back windows, rear door panels, the ramp, etc... want it to be the full functioning kennel by mid july.. want to be able to lock the rig, with the windows down and screens to protect the boy... he should be at a perfect age to really enjoy it and make it his home by the end of the summer, be about 7, 8 months..
maybe get to a console fab too if I can sneak it in.. definitely going to fab it out of alum.......
hopefully I can bang out some of the tank/drawer stuff in aug/sept... I should have the money for it easy enough by that time of the yr.. it'll be more a time thing.. but the fact I'm farming out a bunch of that should help...
money-wise isn't too bad hopefully.. pair of wide, tall PRP's is gonna be like $750.. steel, and some alum, bedliner, etc... so all in, should be the 1200 to 1500 range... it'll be more banging out a full floor fab labor issue...
not only do I need to cut the whole floor out and fab the new, mount seats, divider wall, but that also involves making the grates for the back windows, rear door panels, the ramp, etc... want it to be the full functioning kennel by mid july.. want to be able to lock the rig, with the windows down and screens to protect the boy... he should be at a perfect age to really enjoy it and make it his home by the end of the summer, be about 7, 8 months..
maybe get to a console fab too if I can sneak it in.. definitely going to fab it out of alum.......
hopefully I can bang out some of the tank/drawer stuff in aug/sept... I should have the money for it easy enough by that time of the yr.. it'll be more a time thing.. but the fact I'm farming out a bunch of that should help...






and who knew the weather was gonna be this great...
also, I love driving it....
me love driving it.... 


I can bang out a bunch fab work in that 150 or so hr's...
