Here is the video I promised y’all. I’m sure some of you already have experience with this stuff, but I was really fascinated by the impact it had.
Going to take a couple weeks off. This week is all about the honey-doos. Next week will be half spent in Disney World then hopefully knocking out my father-in-law’s headlight upgrade on his GMT-400.
Once we are past that, it’s back to working on Rusty, tackling the following immediate to-do list:
1. Reseal valve covers
2. Replace coolant crossover pipe
3. Fix or replace power steering pump
4. Replace harmonic balancer
Once that list is done, Rusty will get the same treatment as the 89 did, with the same headliner and sound deadener (best part about this is that it’s all free). I imagine there will be more work involved to remove prior PO work, but that’s expected.
After that, it’s all about the d60. Need to get that done and behind me. Lots of parts to save up for though. After I’m past that, will be tackling the following long-term to-do list:
1. Fine tuning the suspension aka tossing my springs for ORD springs (maybe, maybe).
2. Patch a rust spot in the front pass. floor pan and install some much needed flooring. Floor is currently bare metal. So it’s LOUD.
3. Then at some point will be looking for a donor to rob 4 doors and a tailgate from.
Hope to mix in some small welding projects and some body work too.
IF I get all of that accomplished, that will probably make for a full year’s work.
Then in 2020, I’ll probably be looking at some gearing upgrades and getting back to 37s. BB2020??
I can’t sleep. Can you tell?
If I have repeated any of this from prior posts, forgive me. I have to keep rehearsing this stuff to myself in order to stay focused and motivated.
Here’s to 2019 goals.
Andy