So when's the big cab swap attempt?
Probably tomorrow.
short list for tonight
1) Install MSD adj. rotor and phase it correctly
2) add trans fluid
3) run a brake line down the frame rail and secure it (easier before the cab goes on)
4) wrap the exhaust and tie it off
5) install heater hose barbs and loop the heater hose
6) add coolant
7) add some gas and put a temporary fuel neck on the tank
8) Install cables @ Trans and T-cases
once the cab is on I can install the battery box, wire the starter, alternator, add grounds and wire up the power to FiTech.
Do some basic programming on the FiTech handheld
I think I can fire the engine at that point.
Last edited:
