TreeFarm
Internet fabricator.
Transfer case installed for good. Shifter linkage is done. All of the plumbing is done. I noticed that gmt800 trucks have 34” radiators as well so I picked up a set of their radiator hoses. They fit damn near perfect. I just need to make a perch to hold the upper hose. Things are getting closer. I think I’ll spend the rest of the day bobbing 6” off the back of the bed and figuring out the fuel filler. I want to make a fuel pump access door in the bed as well.






