Gravel Maker
1/2 ton status
The first production run was.....
Scheduled for the middle of last month, however, Conway Freight lost 4400lbs for us and that threw a wrench into the plans because so much had to be remade right them and screw the production schedule. Soooo, we are going to be a couple of more weeks. I was going to make them with or without the insurance companies go ahead anyway.....
54inches said:Any update on the time frame?
Scheduled for the middle of last month, however, Conway Freight lost 4400lbs for us and that threw a wrench into the plans because so much had to be remade right them and screw the production schedule. Soooo, we are going to be a couple of more weeks. I was going to make them with or without the insurance companies go ahead anyway.....