More big progress this weekend!
Hard lines are done. The brake system is once again a closed circuit.
Got the tires put on and this thing is a once again a roller except with completed suspension and axles.
Bought all my fluids. 205 and Eco are filled up.
Started on some exhaust work. I got this Speedway builder kit and some V band clamps. 3 bolt flanges on the headers are getting removed for V band clamps. I got a bunch of pie cut pieces as well. Getting the exhaust around the front shackle hangers is going to be a bit of work.
Lastly I got this exo cage set down in place to figure out how to tie into the B pillar.
The list gets shorter. Need to get the headers installed so I can get the PS pump installed. The exo holds the PS reservoir and radiator so that needs to be installed. Fuel lines, Battery relocation, gauges, and E fans and this thing should start and run again which is my main goal right now.
View attachment 327535
View attachment 327536
View attachment 327537
View attachment 327538
View attachment 327539