After taking out the carrier bearing twice in one wheeling trip last time out I decided to go back to a one piece driveshaft. As I have a Dana 70 rear and can't run a pinion guard I needed something beefier. I had a piece of 2 1/4" diameter seamless tubing with a .330" wall that should work fine.
Bored it out to take the closest weld yokes that I could find in a 1350 joint.

Welded it up and installed new joints and will try it out this week. Not worried about balancing. As I drive it to the ORV park about two hours each way I'll run my rebuilt stock shaft and swap out when I get there.

Bored it out to take the closest weld yokes that I could find in a 1350 joint.

Welded it up and installed new joints and will try it out this week. Not worried about balancing. As I drive it to the ORV park about two hours each way I'll run my rebuilt stock shaft and swap out when I get there.