Got A LOT of fab work done today but had to get back to the house to get some firewood split. WHOOPED to say the least. Didn't take nearly as long as I thought it would to get it all together.
I ended up with a 42" lower arm, center to center on the front bracket and rear link to the frame. Welded my rear tube mounts in for the upper links at 16". I have no mathematical reason or competent assessment of why I put them there, it just looked like they needed to go there...HAHAHAHAAAAAA. Seriously though, locating them at 16" from the bracket centerline puts them just outside the rise in the frame for the front wheel well. In all honestly it should never flex that much (reminding you guys, not a rock crawler) to touch the frame or front body mount. My buddy Tim the welder is tig welding all my crappy Mig tacks and nonsense into a really nice piece. Front radius arms should be ready tomorrow I think. It cost me a case of beer. He'll likely drink all the beer and weld my stuff up tomorrow....when he's sober again.
I have a solid plan now for the crossmember with the rear lower links tied into it. Spent some time in the shop drilling holes in angle which will make up the supports on the outside of the frame. Made a template to bring home to transfer those holes into the frame of my truck. Once the cab is off the frame the crossmember and then the front axle should just bolt right in. Then the real work of locating the drag link and steering components begins. I am fairly certain I know what I am going to do there as well. Just need to do it.
These are the days I wish I had some local homies to come throw some help my way. In all seriousness, I believe If I had extra hands and didn't have to take ten steps to grab a tool or part I could have this truck finished by the end of the month. Waiting on things to get here is the Bain of my existence.