wage92
1/2 ton status
Well i grinded all the places i was going to weld the panels in and it started raining so i guess it will have to wait til tomorrow 
on a better note, a guy is buying my axles tomorrow, this leaves my axle upgrade fund about 50 bucks away from a hd 10b/14bff with 4.56s! hopefully will get figure out how to get that in the next few days.

on a better note, a guy is buying my axles tomorrow, this leaves my axle upgrade fund about 50 bucks away from a hd 10b/14bff with 4.56s! hopefully will get figure out how to get that in the next few days.
oh, when your gunna weld. Get set up and run a couple dry passes with the mig gun before every bead you lay down. Just to make sure you can make a complete pass without getting bound up physically. And wire wheel that weld clean and add a coat of primer to it since your outside and dealing with moisture.
when you start with Mig or tig you develope lazy habits. 

from the same guy i got a hardtop and tailgate that needs some work and he even threw in some diamond plate panels for free
