BlazerBash 22 Prep
Needs
1. console
2. Transfer case shifter
3. nut and bolt check
4. fluid check
5. bump up idle
6. rebuild air bump
7. passenger ball joints
8. swap vss to the tailshaft of trans (new plug)
9. grease u joints
10. Tool box welded and cleaned
Wants
1. door panels
3. rock lights
4. switch panel
5. front bumper lights
6. radiator
It's a never ending cycle, it is never done.
Needs
1. console
2. Transfer case shifter
3. nut and bolt check
4. fluid check
5. bump up idle
6. rebuild air bump
7. passenger ball joints
8. swap vss to the tailshaft of trans (new plug)
9. grease u joints
10. Tool box welded and cleaned
Wants
1. door panels
3. rock lights
4. switch panel
5. front bumper lights
6. radiator
It's a never ending cycle, it is never done.


