Cam installed and degreed, had to grind the retainer plate to obtain proper cam end play. Thanks Heath!
Did a valve to piston check (+.200), pushrod length checked (7.400), rocker arm geometry check.
Heath lapped all valves before final install, then valve springs installed and height checked and shims installed where necessary. After head assembly Heath vacuum checked each combustion chamber, and found 2 exhaust valves that weren’t acceptably seating. Had to disassemble those two and relap them for acceptable sealing.
And a mockup engine for the pic whores! It came back apart and put back into their respective boxes for the ride back to the Flyin Rat Garage.
It was a long day for this old man.
I can’t thank Heath enough for letting me “help” with my engine assembly.