Been working on a new completion list and rethinking the order of tasks:
IRON MAIDEN TASK COMPLETION LIST
Break in engine……call Jerry Arnold for spring change... DONE
Check t/c output angle... DONE
Make transfer case cradle and crossmembers...DONE
Weld rear axle tubes... DONE
Remount rear brake calipers for proper positioning...DONE
Mount rear axle truss ... DONE
Check and modify rear pinion angle... PARTIALLY DONE
Mount anti wrap kit to axle/frame... FINISH WELD WHEN PINION ANGLE IS FINALIZED...ADD GUSSET TO BARS
Figure suspension travel rear...DONE
Figure and Fab shock mounting rear...DONE
Route exhaust system... ..... DONE
Modify frame rail @ rear fuel line....DONE
Modify fuel tank for filler neck....DONE
Install fuel pickup system
Figure, route and fabricate rear brakelines/proportioning valve/parking valve.....DONE
Figure midframe skidplate mounting....DONE
Figure gas tank skidplate mounting....DONE
Fab rear recovery points....GAUNTLET BUMPER
Fab rear tiedown brackets....DONE
REMOVE DRIVETRAIN/STRIP FRAME
Remove front bumpstop brackets
Clearance around pass side header
Weld nuts for skid plates mounting
Sandblast and zinc coat inside of frame rails
Weld up frame boxing kit, tack weld area around FUSH.
Sandblast frame
Clean and seam seal any double layered plates
Paint frame..zinc outside frame rails for welding
Major component completion
..................Engine:
Align crankshaft pulley
Install temp sender
Install oil pressure sender
Valve cover venting
Vacuum advance source
.....................Transmission:
TH400, install trans temp sender unit and check T400 worksheet, and Direct drum measurement
Torque convertor cover mounting holes
Shifter cable hookup
Check pan seal
Install dipstick tube
Install oil cooler line fittings
......................203/205 Doubler:
Dis-assemble the 205 for replacement of the front output, add a spacer, replace the shifter rails w/ ORD rails for triple stick
mount triple stick brackets
Fab and install transfer case venting system
Locktite everything doubler related.
....................Rear 14BFF axle:
Install truss/Antiwrap mounting plates/rear cover
Finish weld Antiwrap bars, and add gusset
Install pinion guard
Sandblast and zinc
....................Front Dana 60 axle:
Fabricate and install front axle truss
check wheel studs for proper fit
check all lugnuts for proper application
Major drivetrain component install
Clean and paint body underside
Body back on frame and Build week begins:
Figure Rock rails and roll cage mounting points....build week
Cage installation.... build week
Keep in mind Gauntlet rear bumper brackets....build week
Seating.... build week
Seat belts.... build week
Shifter mounting .... build week
Weld on roll cage tie in plates....build week
Rock sliders .... build week
Mini Boat side .... build week
Figure and Fab engine cage and front shock mounting(shock hoops to front cage bars)....build week
Figure suspension travel front.....build week
Check front shackle angle....build week
Check front pinion angle....build week
Figure & Fab bumpstops....build week
Figure front tie down bracket placement....build week
Figure and Fab travel limiters....build week
Grab handles.... build week
Cup holders .... build week
Driver reachable storage.... build week
Weld on mounts for Spring limiting blocks (for trailering to limit suspension travel)....build week
Mount rear gauntlet bumper.... build week
Mount front winch bumper.... build week
Install radiator, and windstar fans and wiring....build week
Finalize rear suspension/pinion angle....build week
Final weld rear shock mounting.... build week
Final weld rear spring perches.... build week
Paint rear axle/springs/all brackets/shackles etc.... build week
Misc. items
Figure oil coolers mounting
Figure trans oil filter mounting
Install late model steering box
Install crossover steering
Figure trans temp guage placement and needs
Fab and install axle and t/c venting system
Figure battery cable layout
Fabricate battery mount
Install battery master shutoff
Install remote starter solenoid
Run Battery cables
Mount 9.5XP winch
Install winch fairlead
Figure winch cable routing
Fab and Mount midframe skid plate
Fab and Mount fuel tank skid plate
Route and fabricate front brake lines
Fabricate oil coolers lines
Figure routing for PS/hydroboost hoses/ Make hoses
Fab a mount for Hi-Lift
Fab a mount for fire extinguishers
Fab mounts for coolers, spareparts, and toolbox.