and the continuing to do list I think it's getting smaller
need nuts and bolts for fan brakets
make a strap for the battery
cut the firewall slighty around one battery bolt
clena up wiring on firewall outside
clean up wiring on firewall inside
make temp gauge support
bleed brakes
permanently mount fans with hardware
205 torque mount
fab gas tank filler neck support
install rubber vent line on filler neck
axle vent lines
trans vent line
weld up trans hump
find different nuts and pins for TieRod ends
order/mount hood pins<------yes there is something tricky going on here
attach hood
measure for tube
order tube
radiator overflow
fab engine crossmember
fab 203 crossmember
see if I can talk an alignment shop into getting it aligned
swap in an XJ steering shaft--got one coming this week
get teh exhaust done
mount rear shocks---fab work
fab some attachment points
fab cage
dash<---possibly another trick up my sleeve
swap windshield form Jimmy to blazer
grease king pins
install hydro asssist
extend bump stops
install fuel filter
swap in an electric fuel pump
clean out just the junk that's gathered in the truck
setup relays----determine how many I need
rock lights
oh and BUY SOME ZIP TIES!!

tranny needs fluid
change the oil
alot of this will get done tomorrow. I had to put off the fab stuff today after my grinder crapped out on me. But I'll borrow one from work tomorrow and see if I can get that stuff done.